Weekend Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Question # 4

Which statement about HPE Superdome nPars is true?

A.

Chassis in the same nPar can have different CPU configuration

B.

Rack Management Controller is required Tor nPar configuration

C.

Chassis in the same nPar can have different memory configuration

D.

nPars are supported only with 3rd Generation Intel Xeon Scalable Processors

Full Access
Question # 5

Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames

How will this change impact the customer environment?

A.

The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.

B.

The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.

C.

The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.

D.

The customer can add a new logical enclosure to an existing setup once all required licenses are addedtoHPE OneView and associated with the new frames.

Full Access
Question # 6

After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.

Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

Full Access
Question # 7

Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.

Which HPE compute system meets this customer's requirements?

A.

HPE ProLiant DL380 Gen 10 Plus

B.

HPE Synergy 480 Gen10 Plus

C.

HPE ProLiant DL560 Gen10

D.

HPE Superdome Flex 280

Full Access
Question # 8

What is one of me benefits of using HPE Composer 2?

A.

HPE Composer 2 has 128GB of memory and 4 AMD CPUs to improve performance of me management system

B.

HPE Composer 2 modules are required to manage HPE virtual Connect SE 100GD F32 Modules for Synergy

C.

The administrator can access an HPE Synergy Composer 2 appliance remotely to perform First Time Setup

D.

A pair of HPE Composer 2 modules can manage 42 frames, compared to 21 frames managed by HPE Composer

Full Access
Question # 9

An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.

Click the parameter that the customer should configure within an uplink set to meet this requirement

Full Access
Question # 10

Your customer plans to manage HPE Primera using HPE Oneview

Which storage management tasks can be completed using HPE OneView for this environment?

A.

CPG management

B.

Volume provisioning

C.

Cache management

D.

Replication setup

Full Access
Question # 11

You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.

What is required from the VMware side to enable LAG?

A.

Virtual Distributed Switch

B.

vSphere Standard license

C.

Load balancing cluster

D.

Dedicated VMKernel port

Full Access
Question # 12

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Full Access
Question # 13

Which HPE Virtual Connect feature allows an administrator to suppress excessive inbound multicast broadcast and destination lookup failure (OLF) packets?

A.

Pause flood protection

B.

Loop protection

C.

LLDP tagging

D.

Storm control

Full Access
Question # 14

Match each HPE OneView network type with its definition.

Full Access
Question # 15

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.

Full Access
Question # 16

Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.

What should you do to resolve this issue?

A.

Disable deduplication for this volume at the array level

B.

Remove the offline disks using array management tools

C.

Install and configure MPIO on me Windows system

D.

Remove the offline disks using Windows Disk Management

Full Access
Question # 17

Which statement about HPE OneView milestone releases is true?

A.

A milestone release is a release which must be installed on HPE Composer to support current version of the Service Pack for Synergy

B.

A milestone release is a release that is published when HPE releases new hardware components to immediately support new systems

C.

A milestone release is available for selected partners that give access to HPE OneView features which are not officially announced.

D.

A milestone release is a release with an enhanced update architecture mat is a prerequisite prior to updating to a subsequent release.

Full Access
Question # 18

An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays

Where should you start the troubleshooting process?

A.

At the iLO interface to verify whether the ILO Advanced license is properly applied

B.

At HPE OneView Interface to verify whether the server is In the maintenance mode

C.

At the iLO interface to verify whether the SSO certificate is removed from an iLO.

D.

At HPE OneView Interface to verify whether the iLO processor is disabled

Full Access
Question # 19

Which compute node parameters are captured within server hardware type?

A.

Number of the CPUs

B.

installed operating system

C.

Mezzanine card configuration

D.

Size of the memory Installed

Full Access
Question # 20

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Full Access
Question # 21

What is a restriction of using a RoCE network?

A.

It is by default configured as an untagged network and cannot be a part of a network set.

B.

It does not support Private VLAN and Multicast VLAN.

C.

it is not supported with HPE Virtual Connect SE 40 GD F8 Module for HPE Synergy.

D.

It does not support smart link and private network features.

Full Access
Question # 22

Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards

They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration

- two HPE Synergy Virtual Connect SE 32Gb FC Modules

- two HPE Synergy 20Gb interconnect Link Modules

- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards

Which statement about the planned configuration change is true?

A.

Four compute modules must be moved to the second frame to balance the configuration

B.

The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option

C.

A license for an extended logical enclosure must be added to HPE OneView through GUI

D.

The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked

Full Access
Question # 23

You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.

Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

A.

App Volume Set

B.

Storage Container

C.

Virtual Volume Set

D.

virtual Volume

Full Access