An administrator wants to make a new application highly available.
Which two capabilities must the application have to be managed be Veritas Cluster Server? (Select two.)
Which two actions must an administrator take to upgrade an application under cluster control? (Select two.)
Which requirement must be met to allow two separate Veritas InfoScale clusters to share a common private heartbeat network switch?
The Oracle database administrator needs to shut down the Veritas Cluster Server (VCS) controlled database to apply patches. The manual shutdown the database may cause VCS to fail over the service group.
Which command can the administrator run to prevent VCS from responding to the intentional Oracle database shutdown?
What are two resource types that Proxy resources can reference? (Select two.)
Refer to the exhibit.
The exhibit shows an N-to-1 cluster configuration, in which nodes are connected to storage devices via dual-hosted SCSI cables.
Why is this an inefficient configuration?
An administrator is configuring a websg service group and a dbsg service group. The administrator needs to configure Veritas Cluster Server so websg will only come online if dbsg is online somewhere in the cluster.
If dbsg faults, websg should stay online. If dbsg is unable to fail over, the websg should stay online.
Which type of service group dependency does this require?
Which two meters can the administrator use for the system capacity calculation when the FailOverPolicy of a service group is set to BiggestAvailable? (Select two.)