Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8)

Last Update 3 hours ago Total Questions : 198

The Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) content is now fully updated, with all current exam questions added 3 hours ago. Deciding to include NCSE-Core practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our NCSE-Core exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these NCSE-Core sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) practice test comfortably within the allotted time.

Question # 4

During a sales motion with a new prospect, the prospect and SE agree to evaluate Nutanix and a computing platform using XRay.

The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity.

Which two details must be discussed with the prospect before the POC starts? (Choose two)

A.

Model of Fibre Channel switch

B.

Gather details of customer's existing 3-tier hardware

C.

ldentify appropriate POC hardware

D.

A test plan with agreed upon success criteria

E.

What type of external storage will be connected

Question # 5

A prospect provides sizing details for a new application that will require 15TiB of usable storage. The prospect needs to plan for an additional 20% storage growth as part of the initial purchase. Including capacity to fully re-protect in the event of a node failure, which configuration provides minimal cost while meeting the capacity requirement?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question # 6

A Nutanix customer needs to migrate 1000VMs from ACME Public Cloud to a local Nutanix cluster ACME Public Cloud operates on VMware ESXi, Hp ProLiant Servers with 3PAR storage. ACME Public Cloud denies customers access to vCenter or ESXi hosts But they do replicate a copy of the virtual disks to external storage.

Which method should the customer use to migrate the VMs to a local Nutanix Cluster?

A.

Use Xtract for VMs to migrate VMs from ACME Public Cloud vCenter to local Nutanix cluster.

B.

Deploy Nutanix Community Edition in ACME Public Cloud and replicate VMs to local Nutanix cluster.

C.

Use Calm to automate and orchestrate deployment on the local Nutanix cluster.

D.

Use the latest copy of VMs on external storage to import on the local Nutanix cluster

Question # 7

Refer to the exhibit.

***Exhibit is Missing***

Based on the sizing scenario, what level of resiliency can be inferred about the configuration?

A.

FTT1

B.

N+0

C.

N+1

D.

N+2

Question # 8

A customer has deployed Nutanix with Esxi for VDI workloads and is considering Nutanix for a major server virtualization project. The customer is running z/Virtual Machine today for a mission critical workload and would like to consider Nutanix as a potential platform.

Which reason would currently disqualify this prospect as an opportunity?

A.

Accurate sizing information is not available

B.

Nutanix does not support z/OS or z/VM

C.

There is no assurance of project progression yet.

D.

New hardware will be announced next quarter.

Question # 9

A prospect uses VMware, Oracle and Microsoft products for their critical operations. The prospect prefers an all-flash array because they have significantly invested in servers for their oracle environment to save on licensing costs.

Which feature should be discussed to address this objection?

A.

AHV

B.

Hyper-V Support.

C.

ABS

D.

All-flash nodes.

Question # 10

Which function does the Curator service perform?

A.

Schedules snapshots

B.

Start and stops other cluster services

C.

Stores cluster configuration

D.

Distributes storage optimization tasks

Go to page: