11.11 Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Question # 4

In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

A.

7

B.

8

C.

12

D.

13

Full Access
Question # 5

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Full Access
Question # 6

Which of the following transportation modes can be included as an alternative commuting methodin the calculation for Location and Transportation Credit, Alternative Transportation?

A.

Trips avoided while on vacation

B.

Trips avoided while on business travel

C.

Trips avoided because of telecommuting

D.

Trips avoided by commuting on a motorcycle

Full Access
Question # 7

Buildings account for what percentage of total energy use?

A.

30%

B.

40%

C.

50%

D.

60%

Full Access
Question # 8

A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?

A.

Submit a Project CIR

B.

Use the incomplete data as is

C.

Remove the missing meter data from the credit upload

D.

Extend the performance period to gain the full three months of weekly water meter readings

Full Access
Question # 9

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Full Access
Question # 10

What credit rewards customers who change their normal consumption patterns in response to the varying price of

energy over time?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Full Access
Question # 11

In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

A.

12 hours

B.

24 hours

C.

48 hours

D.

72 hours

Full Access
Question # 12

Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?

A.

Refrigerators

B.

Replacement carpet tiles

C.

Janitorial paper purchases

D.

Automated scrubbing machines

Full Access
Question # 13

Which of the following strategies improves cooling tower water efficiency?

A.

Increase cooling tower fan speed

B.

Increase the cooling tower blowdown

C.

Install and maintain a conductivity meter

D.

Lower set point of water leaving cooling tower

Full Access
Question # 14

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Residential dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Residential clothes washers and vending machines

Full Access
Question # 15

How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water

Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

A.

Six months

B.

12 months

C.

18 months

D.

This type of fixture should not be metered

Full Access
Question # 16

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Full Access
Question # 17

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Full Access
Question # 18

For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

A.

80 picograms per lumen hour for 90% of lamps

B.

90 picograms per lumen hour for 90% of lamps

C.

70 picograms per lumen hour for all mercury-containing lamps

D.

80 picograms per lumen hour for all mercury-containing lamps

Full Access
Question # 19

The Materials and Resources (MR) section includes which of the following building products in Credit calculations?

A.

Furniture

B.

Light Fixtures

C.

Plumbing Fixtures

D.

Mechanical Equipment

Full Access
Question # 20

Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

A.

Requires input of 36 months of data

B.

Requires ISO 14001 compliance

C.

Requires calculation and input of site energy usage

D.

Requires California Title 24 compliance

Full Access
Question # 21

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

A.

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Full Access
Question # 22

In which of the following ways can a campus project using a Group Approach comply with Water Efficiency

Prerequisite, Building-Level Water Metering?

A.

Meter water use for each building separately; meter outdoor water use for the associated grounds

B.

Meter water use for the entire campus (buildings and the associated grounds) using a single meter

C.

Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds

does not need to be metered

D.

Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated

grounds

Full Access
Question # 23

The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is

A.

correlated to an increase of the floor area by at least 5%

B.

determined based upon flush-out procedure requirements

C.

determined by the project team as there is no minimum requirement

D.

correlated to alterations that include construction activity by more than one trade

Full Access
Question # 24

An Indoor Environmental Quality policy for facility maintenance and renovation activities under Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy must follow the recommended

A.

procedures in Indoor Environmental Quality Green Cleaning Policy, In-house Green Cleaning Policy thermal comfort strategies in American Society of Heating Refrigerating and Air Conditioning Engineers

(ASHRAE) 55-2010

B.

direct exhaust airflow measurement strategy using devices capable of measuring the exhaust airflow meeting fresh air requirements

C.

control measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor

D.

Environmental Quality Guidelines for Occupied Buildings Under Construction

Full Access
Question # 25

Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

A.

Basis of Design

B.

Design Narrative

C.

Owner Project Requirements

D.

Current Facility Requirements

Full Access
Question # 26

A management method that could be included in a project's site management policy is the use of

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Full Access
Question # 27

Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards

compliance for what category of building space?

A.

Exterior

B.

Lavatory

C.

Mechanical

D.

Individual occupant

Full Access
Question # 28

What is the maximum distance food or beverage raw materials can be harvested and produced in order to achieve the Materials and Resources Credit, Purchasing - Ongoing?

A.

60 mi. (97 km)

B.

75 mi.(120 km)

C.

85 mi. (137 km)

D.

100 mi.(160 km)

Full Access
Question # 29

A building manager benchmarks a building's energy performance in ENERGY STAR® Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?

A.

Examine average and peak utility costs

B.

Develop a sequence of operations for building systems

C.

Create an energy use breakdown by major system types or end uses

D.

Establish target energy and cost reduction goals as part of the ASHRAE energy use analysis

Full Access
Question # 30

Which of the following environmental concerns is exacerbated by impervious surfaces?

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Full Access
Question # 31

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Full Access
Question # 32

Storage locations are required for which of the following recyclable materials?

A.

Mixed paper, paint, glass, plastics and electronics

B.

Mixed paper, corrugated cardboard, wood pallets, plastics and metals

C.

Mixed paper, batteries, glass, plastics and electronics

D.

Mixed paper, corrugated cardboard, glass, plastics and metals

Full Access
Question # 33

What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?

A.

Rated life

B.

Light trespass

C.

Power demand

D.

Luminary equivalency

Full Access
Question # 34

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Full Access
Question # 35

A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables. Which of the following should be used to normalize the building's energy use?

A.

Relative production

B.

Number of parking spaces

C.

Gal. (I) of water used

D.

Area (ft2 or m2)

Full Access
Question # 36

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Full Access
Question # 37

Which of the following prerequisites or credits has a minimum occupancy requirement?

A.

Indoor Environmental Quality Credit, Daylight and Views

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance

Full Access
Question # 38

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Full Access
Question # 39

The compliant value of green cleaning products and materials is calculated using what factor?

A.

Cost

B.

Weight

C.

Volume

D.

Recycled content

Full Access
Question # 40

Which of the following statements must be true in order to achieve the Water Metering Credit?

A.

All meters must be recorded weekly and shared with USGBC over a five-year period beginning on the date the project accepts LEED certification

B.

All meters must be recorded biweekly and shared with USGBC over a three-year period begin-ning on the date the project accepts LEED certification

C.

All meters must be recorded biweekly and shared with USGBC over a five-year period begin-ning on the registration date of the LEED project

D.

All meters must be recorded weekly and shared with USGBC over a three-year period begin-ning on January 1st of the year in which the project accepts LEED certification

Full Access
Question # 41

A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?

A.

$0.00 USD

B.

$162.50 USD

C.

$325.00 USD

D.

$650.00 USD

Full Access
Question # 42

When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?

A.

An ASHRAE Level 2 audit is required for newer buildings while commissioning is required for buildings in operation for more than five years

B.

An ASHRAE Level 2 audit requires development of an energy use breakdown based on sub-metering while commissioning requires development of an energy use breakdown based on energy modeling

C.

An ASHRAE Level 2 audit involves testing the operation of the systems against the sequences of operation while commissioning involves determining that the system operation meets the owner's current facility requirements

D.

An ASHRAE Level 2 audit focuses on finding major upgrades to the building envelope or me-chanical, electrical, or controls systems while commissioning focuses on controls, proper sys-tem operations, and efficiency improvements

Full Access
Question # 43

Which of the following strategies are eligible for reducing the landscape water demand in Water Efficiency Credit, Outdoor Water Use Reduction?

A.

Mulched paths and weather sensor controls

B.

Plant species selection and irrigation efficiency

C.

Plant species selection and permeable pavement

D.

Artificial turf grass and alternative water sources

Full Access
Question # 44

The measures called out on the following site plan may contribute to the achievement of which LEED credits?

(Click on Exhibit)

Exhibit

A.

Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Light Pollution Reduction

B.

Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Heat Island Reduction

C.

Sustainable Sites Credit, Rainwater Management; Location and Transportation Credit, Alternative

Transportation

D.

Sustainable Sites Credit, Rainwater Management; Indoor Environmental Quality Credit, Integrated Pest

Management

Full Access
Question # 45

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Full Access
Question # 46

For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?

A.

Encourage telecommuting and the use of mass transit

B.

Survey visitors to determine their transportation modes

C.

Survey the occupants to determine their transportation modes

D.

Provide parking for low-emitting vehicles for 5% of the building occupants

Full Access
Question # 47

The environmentally preferable purchasing policy (EPP) required in the Materials and Resources Prerequisite, Ongoing Purchasing and Waste Policy should address the criteria in which Materials and Resource Credit?

A.

Purchasing - Lamps

B.

Solid waste management - Ongoing

C.

Purchasing - Facility maintenance and renovation

D.

Solid waste management - Facility maintenance and renovation

Full Access
Question # 48

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

Full Access
Question # 49

Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)

A.

All of the five parameters summed together

B.

All of the five parameters subtracted from the maximum concentration level

C.

Whichever of the five parameters has the fewest calculated cycles of concentration without exceeding the maximum level for the parameter

D.

Whichever of the five parameters has the greatest calculated cycles of concentration without exceeding the maximum level for the parameter

Full Access