You are installing an HCP G10 and are now setting the front-end connectivity. The customer has provided you with IP addresses for their network for each node.
Which two actions should be performed on each node as part of the OS installation? (Choose two.)
You need to convert the installation media ISO image to a bootable USB drive.
Which tool from the "HCP-G10-Tools" package should you use?
You are preparing to perform an offline upgrade on an HCP G10 and the pre-upgrade check procedure fails. The error message says that you do not have enough capacity on node 103 to perform the upgrade.
Which service procedure should you run to resolve this problem?
What is required to configure host group security on a new HCP G10 with attached storage?
A customer is using a four-node HCP G10 cluster and they would like to upgrade to eight nodes.
Which two node models can be used to upgrade the cluster? (Choose two.)