Black Friday Special Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Question # 4

What can you configure in the settlement profile?

Note: There are 2 correct answers to this question.

A.

Determine whether settlement is required.

B.

Determine an overhead key.

C.

Define a number range for settlement documents.

D.

Define settlement document type.

Full Access
Question # 5

You have implemented Product Cost by Sales Order in conjunction with cost-based POC results analysis in your organization. For a particular sales order item, you have the following:

Plan revenue = 3000, Plan costs = 2000, Actual revenue = 1200, Actual costs = 1000.

What data does the system calculate during results analysis?

A.

Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200

B.

Revenue = 1200; Cost of sales = 1000; Revenue surplus = 200

C.

Revenue = 1500; Cost of sales = 1000; Revenue surplus = 300

D.

Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300

Full Access
Question # 6

Which receiver must be allowed in the settlement profile of a product cost collector?

A.

Material

B.

Order

C.

Profitability segment

D.

Sales order item

Full Access
Question # 7

What are some of the characteristics of planning for internal orders?

Note: There are 2 correct answers to this question.

A.

Availability control can check against plan values.

B.

You can enter costs and revenues.

C.

You can plan multiple versions.

D.

You can define tolerance limits for plan overspend.

Full Access
Question # 8

What values flow from Sales and Distribution billing to costing-based Profitability Analysis?

Note: There are 2 correct answers to this question.

A.

Value of conditions of the pricing procedure

B.

Value of "Gross Margin 2"

C.

Cost of goods sold split by cost components

D.

Production variances split by variance categories

Full Access
Question # 9

Which of the following statements best describe Product Cost by Period?

Note: There are 2 correct answers to this question.

A.

It is used to analyze costs by individual production lots.

B.

It is used in conjunction with a product cost collector.

C.

It is used when the focus of controlling is on a stable and continuous production process.

D.

It is used to analyze work in process (WIP) based on actual costs.

Full Access
Question # 10

Which of the following API types does SAP recommend to use to achieve clean core Integrations?

Note: There are 2 correct answers to this question.

A.

SOAP

B.

RFC

C.

IDoc

D.

OData

Full Access
Question # 11

In which module do you process profit center allocations in SAP S/4HANA?

A.

Account-based profitability analysis

B.

General ledger accounting

C.

Product cost accounting

D.

Cost center accounting

Full Access
Question # 12

You want to set up integrated planning for your internal orders.

Note: There are 2 correct answers to this question.

A.

Set the relevant indicator in the controlling area.

B.

Set the relevant indicator in the CO version.

C.

Set the relevant indicator in the planning profile of the order type.

D.

Set the relevant indicator in the internal order master record.

Full Access
Question # 13

Your enterprise has five company codes assigned to three separate operating charts of accounts.

What is the optimal way of configuring the relationship between operating concerns and controlling area?

A.

Three operating concerns; three controlling areas

B.

One operating concern; three controlling areas

C.

One operating concern; five controlling areas

D.

One operating concern; one controlling area

Full Access
Question # 14

What are some of the unique attributes of an assessment cycle in Controlling?

Note: There are 3 correct answers to this question.

A.

They use the original cost element during transfer.

B.

They use a secondary cost element during transfer.

C.

They can be processed in an iterative way.

D.

They transfer primary and secondary costs.

E.

They can be defined with an allocation structure.

Full Access
Question # 15

How can you configure the transfer price solution in SAP S/4HANA?

Note: There are 2 correct answers to this question.

A.

Use separate segments for each valuation.

B.

Use separate material ledgers for each valuation.

C.

Use separate ledgers for each valuation.

D.

Use separate currency types within the same ledger for each valuation.

Full Access
Question # 16

Which default values can you configure for the product cost collector?

Note: There are 2 correct answers to this question.

A.

Variance variant

B.

Results Analysis (RA) key

C.

Costing variant for preliminary costing

D.

Results Analysis (RA) version

Full Access
Question # 17

You want to use budget availability control for your projects and internal orders. What can you check using budget availability control?

Note: There are 2 correct answers to this question.

A.

The availability of funds in object currency

B.

The availability of funds on a period level

C.

The availability of funds using overall plan value

D.

The availability of funds according to tolerance limits

Full Access
Question # 18

Which statement best describes cost center standard hierarchy?

A.

It is a structure to which all the cost centers within a controlling area are assigned.

B.

It is a structure to which all cost centers of a client have to be assigned.

C.

It is a structure where all cost centers with the same currency are defined.

D.

It is a structure where all cost centers within the same operating concern are defined.

Full Access
Question # 19

What can you manage via the account assignment category?

Note: There are 2 correct answers to this question.

A.

Accounting via sales order

B.

Separate sales order stock

C.

Results analysis key

D.

Costing variant

Full Access
Question # 20

Why would you use manual cost allocation in Controlling?

Note: There are 2 correct answers to this question.

A.

To run simple allocations of plan data

B.

To run simple allocations of actual data

C.

To correct secondary postings

D.

To allocate costs using an allocation cycle

Full Access
Question # 21

At which level do you define the valuation method for results analysis?

A.

Valuation area

B.

Operating concern

C.

Client

D.

Controlling area

Full Access
Question # 22

Which of the following objects can be selected in templates for activity-based costing?

Note: There are 2 correct answers to this question.

A.

Business process

B.

WBS element

C.

Cost center/activity type

D.

Internal order

Full Access
Question # 23

What can you do with statistical internal orders?

Note: There are 2 correct answers to this question.

A.

Perform budget availability control.

B.

Simultaneously post to a cost center.

C.

Settle to a CO-PA segment.

D.

Perform results analysis.

Full Access
Question # 24

What master data objects can you set up using time-based fields?

Note: There are 2 correct answers to this question.

A.

Activity types

B.

Cost centers

C.

Cost elements

D.

Statistical key figures

Full Access