Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?
How can you characterize dependent requirements in material requirements planning?
Note: There are 2 correct answers to this question.
Which master data object governs the relationship between supply source and demand source in the Kanban process?
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.
Which business processes are affected by settings in the order-type-dependent parameters?
Note: There are 2 correct answers to this question.
Which of the following processes lead to an entry in the MRP planning file?
Note: There are 3 correct answers to this question.
During production order creation, several valid production versions are found. How does the system choose the production version?
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.