Question # 4

The Chief Information Security Officer (CISO) for an organization is concerned about the security posture of the operating system images that are used for the provisioning of their Software-as-a-Service (SaaS) applications. The organization is in a growth period. The organization is opening a new data center to launch its next phase of new SaaS-based solutions.

The DevOps team currently creates encrypted virtual machine (VM) templates that are used for various operating systems and adds these to the vSphere inventory. The DevOps team already uses a published content library and has been granted a role with the ability to add and delete library items.

The following requirements have been noted:

  • Impacts to the DevOps team’s operational processes must be kept to a minimum.
  • The DevOps team must be able to regularly check out a copy of the image for updates and check in a new version of the image.
  • Images must be synchronized from the primary data center to the new data center.

Which three recommendations should the architect make to design a content library solution that will meet these requirements? (Choose three.)

A.

Clone virtual machines as VM templates to the published content library

B.

Create a subscribed library from the published library and synchronize Open Virtualization Format (OVF) templates on-demand

C.

Create a subscription and publish VM templates to a subscribed content library

D.

Create a subscribed library from the published library and synchronize Open Virtualization Format (OVF) templates automatically

E.

Clone virtual machines as Open Virtualization Format (OVF) templates to the published content library

F.

Update the role for the DevOps team with new privileges

Full Access
Question # 5

In a meeting to discuss the minimum viable product (MVP) deployment of a new customer-facing application, the key stakeholder shares details of the application components and the application administrators share details of performance and integrity tests for the application.

The application will be made up of the following components:

  • A web server

-Steps to confirm the web server is operating correctly will take 15 minutes after the application server is online.

  • An application server

-Steps to confirm application server integrity will take 15 minutes after the database is online.

  • A database server

-The database server will be managed by a database administrator, with an agreed service-level agreement (SLA) to restore and validate database services within one hour.

The existing VMware infrastructure offers a recovery point objective (RPO) of 5 minutes and recovery time objective (RTO) of 15 minutes through a combination of backups and replication.

In the event of an outage impacting all three application components, how long will it take for the application to recover and complete all checks?

A.

15 minutes

B.

60 minutes

C.

105 minutes

D.

90 minutes

Full Access
Question # 6

An architect is designing a new greenfield environment that will install ESXi on local disks. There is a requirement to streamline initial and future installations of ESXi hosts.

Which configuration option should the architect recommend for installing ESXi hosts to meet these requirements?

A.

Installation with kick start script

B.

Auto Deploy with stateless caching mode

C.

Manual installation using boot from SAN

D.

Auto Deploy with stateful install mode

Full Access
Question # 7

An architect is designing a new VMware solution for a customer that has a number of different resource profiles.

The following are the business requirements for the design:

The solution must support virtual machines with the following storage profiles:

-Write-intensive

-Backup

-Write-Once-Read-Many (WORM) archive

  • The solution must support migration of virtual machine disks between storage profiles.
  • The WORM archive data must be located at an isolated secure site.
  • The backup storage array must only be connected to a backup media server.
  • All data should be recoverable from backup.

Which design decision should the architect make to meet the business requirements?

A.

The solution will leverage a single storage array for the WORM archive and write-intensive storage profiles

B.

The solution will leverage the same array for the backup and write-intensive storage profiles

C.

The solution will leverage a different array for each storage profile

D.

The solution will leverage a single storage array for all storage profiles

Full Access
Question # 8

Which two of the listed requirements would be classified as performance non-functional requirements? (Choose two.)

A.

The vSphere platform must be able to provide a recovery time objective of 30 minutes

B.

The vSphere platform must be able to provide a minimum throughput of 400 MB/s

C.

The vSphere platform must be able to provide N+1 redundancy

D.

The vSphere platform must be able to provide a maximum read latency of 15 ms

E.

The vSphere platform must be able to provide a service-level agreement (SLA) of 99,9%

Full Access
Question # 9

A customer has six hosts available in a cluster. When running at full capacity, all virtual machines can be run on two hosts.

How many hosts can the customer place into maintenance mode at the same time while still providing N+2 resiliency to the cluster?

A.

Two

B.

Three

C.

One

D.

None

Full Access
Question # 10

Which of the listed requirements would be classified as a recoverability non-functional requirement?

A.

The platform must be integrated with existing change control policies.

B.

The platform must be able to support a maximum tolerable downtime (MTD) of 30 minutes.

C.

Maintenance windows must be scheduled to take place monthly during an established overnight period.

D.

The platform must be available 24 hours a day, 7 days a week with the exception of scheduled downtime.

Full Access
Question # 11

An architect is tasked with reviewing the design of a VMware software-defined data center (SDDC) for a software development company. The platform is used to developing applications and services. It is important that the customer be able to accurately benchmark performance of developed applications.

The platform has recently commissioned new hosts to update the development cluster.

The development cluster host configuration is:

  • 4 ESXi hosts with 2 sockets × 16 cores
  • 512 GB RAM divided evenly between sockets
  • There is no resource contention

The benchmarking cluster host configuration is:

  • 8 ESXi hosts with 2 sockets × 8 cores
  • 256 GB RAM divided evenly between sockets
  • There is no resource contention

The customer is developing an application that includes a database virtual machine. The application developer states that the database virtual machine performs as required only when allocated 8 vCPUs 256 GB RAM. The database virtual machine performance meets the required levels when run from the development cluster. Performance benchmarking for the database virtual machine yields highly variable results when run from the benchmarking cluster. The application cannot be released without reliable performance benchmarking data.

What is a possible reason for the difference in performance test results between the development and benchmarking clusters?

A.

The database tier breaches a single NUMA node boundary for the benchmarking cluster

B.

The database tier breaches a single NUMA node boundary for the development cluster

C.

The development cluster can support a lower %Ready time per vCPU

D.

The development cluster has more available RAM per host

Full Access
Question # 12

An architect is creating a network design for a new vSphere environment.

Based on customer requirements, the environment must support the following types of traffic:

  • Management
  • vMotion
  • vSAN
  • Fault Tolerance
  • Virtual machine traffic, which cannot be impacted by other types of traffic

Which design recommendation can the architect make for a resilient infrastructure with vSphere network service tiering?

A.

Use different logical networks to ensure traffic is isolated with separate VLANs

B.

Use Network I/O Control and ensure appropriate share value is defined for different types of traffic giving priority to the virtual machines traffic

C.

Use two dedicated virtual switches with a single adapter each, dedicating one virtual switch for Management, vMotion, vSAN and Fault Tolerance traffic, and the second one for virtual machine traffic

D.

Use a NIC teaming policy based on the physical NIC load

Full Access
Question # 13

A new vSphere platform is being created. The platform will host virtual machines that will run management services and line-of-business applications.

What should the architect consider when designing the number and type of clusters required?

A.

Maximum tolerable downtime

B.

Predicted platform growth

C.

Auditing requirements for the virtual machines

D.

The level of isolation required between virtual machine classifications

Full Access
Question # 14

During a requirements gathering workshop, the customer’s Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:

  • All operating system critical patches must be installed within 24 hours of release.
  • All virtual machine templates must be updated every three months in line with company policy.

Which requirement classification is being gathered for the design documentation?

A.

Security

B.

Manageability

C.

Recoverability

D.

Availability

Full Access
Question # 15

An architect is designing a VMware software-defined data center (SDDC) solution based on the following customer requirements:

  • The solution must initially support 1,000 virtual machines
  • The solution must scale to support the concurrent running of up to 5,000 virtual machines
  • The production environment should be delivered across two data centers
  • The solution should have a maximum tolerable downtime (MTD) of four hours
  • The solution should have a monthly service availability target of 99.8%

Which two assumptions could the architect make based on the information from the customer to help size the solution? (Choose two.)

A.

The number of vSphere hosts in a cluster

B.

The average resource utilization of a virtual machine

C.

The size (CPU/RAM/storage) of the average virtual machine

D.

The guest operating system for each virtual machine

E.

The size (CPU/RAM/storage) of the vSphere hosts

Full Access
Question # 16

An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI- based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.

What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?

A.

Two 1 GbE network adapters per server

B.

Four 1 GbE network adapters per server

C.

Four 10 GbE network adapters per server

D.

Two 10 GbE network adapters per server

Full Access
Question # 17

Following a recent acquisition, the architect learns that both companies use vSphere on-premise and will need to combine the data centers into one. The acquired company's licenses will not be renewed for cost-savings related to the acquisition. All consumed vSphere licenses must have active support to support line-of-business operations. The merged environment must maintain 25% spare capacity. The architect has a small budget remaining unallocated for hardware.

The architect has calculated that the current vSphere environment can absorb the acquired company's virtual machines but the cluster will run at 90% memory utilization and at 50% CPU utilization.

Which design decision can the architect make to incorporate the new company's virtual machines into the combined vSphere environment?

A.

Migrate the acquired company's virtual machines into the vSphere environment as it will currently fit.

B.

Use the current budget to add memory to the cluster to increase each ESXi host's capacity and add the new virtual machines.

C.

Purchase extra hosts to add to the cluster in anticipation of adding the acquired company's virtual machines.

D.

Purchase new licenses for some of the acquired company's ESXi hosts and add them to the cluster to hold the acquired company's virtual machines.

Full Access
Question # 18

Which two statements are true about gathering functional business and application requirements? (Choose two.)

A.

It focuses on functional requirements with C-level stakeholders

B.

It leverages a single set of QUESTION NO:s for all stakeholders

C.

It might require multiple rounds of stakeholder interviews

D.

It builds stakeholder consensus

E.

It is a non-iterative process

Full Access
Question # 19

Which design decision must be included in a design to allow for the deployment of a minimum supported configuration of vCenter High Availability (HA)?

A.

A new subnet will be provisioned for vCenter HA services

B.

A vSphere cluster will consist of more than three nodes

C.

The deployed vCenter Server will be Tiny

D.

The vCenter HA network will support a latency of less than 50 ms

Full Access
Question # 20

During a requirements gathering workshop, the customer provides the following information:

  • Each host has 2 × 10 GbE NIC
  • EtherChannel is not currently configured
  • No changes can be made to the physical network
  • Network throughput must be prioritized for defined critical services

Which two recommendations should the architect make with regard to virtual networking? (Choose two.)

A.

Use Route Based on Physical NIC Load.

B.

Use Network I/O Control with Shares.

C.

Use Network I/O Control with Reservation.

D.

Use Link Aggregation Control Protocol (LACP).

E.

Use Network I/O Control with Limits.

Full Access
Question # 21

As part of a requirements gathering workshop, the customer provides the following requirements for the design of a new greenfield virtual infrastructure:

  • Some applications have a latency that must be less than 5 minutes.
  • The solution must be able to support a workload growth rate of 10% per year.

Which requirement classification is being gathered for the design documentation?

A.

Performance

B.

Manageability

C.

Recoverability

D.

Availability

Full Access
Question # 22

An architect makes the design decision to install ESXi on embedded and resilient 8 GB SD cards.

What is the impact of this design decision?

A.

Host profiles must be used for this kind of installation

B.

Scratch partition would need to be created on the external storage

C.

The size of the SD cards is too small and the installation will fail

D.

The vSphere Auto Deploy feature must be enabled on vCenter Server

Full Access
Question # 23

An architect has 50 ESXi hosts to deploy and DHCP servers are not allowed on any network. Which automated host deployment method should the architect use?

A.

Stateless vSphere Auto Deploy

B.

Stateful vSphere Auto Deploy

C.

Scripted installation

D.

Interactive installation

Full Access
Question # 24

Following a recent acquisition, an architect needs to merge IT assets into its current data center. The combined vSphere environment will need to run the newly acquired company’s virtual machines.

Network integration work has already been completed and the current environment has capacity to host all virtual machines. The Operations team needs to identify which virtual machines belong to the acquired company and report on their usage.

How should the architect merge the company’s assets and virtual machines?

A.

Leave the newly acquired company’s assets in its current place

B.

Lift and shift the acquired assets into the data center

C.

Migrate the acquired company’s virtual machines into the existing vSphere environment

D.

Migrate and apply vSphere tags to the acquired company’s virtual machines

Full Access
Question # 25

An organization’s data scientists are executing a plan to use machine learning (ML). They must have access to graphical processing unit (GPU) capabilities to execute their computational models when needed. The

solutions architect needs to design a solution to ensure that GPUs can be shared by multiple virtual machines.

Which two solutions should the architect recommend to meet these requirements? (Choose two.)

A.

NVIDIA vGPU

B.

AMD MxGPU

C.

vSphere DirectPath I/O

D.

vSGA

E.

vSphere Bitfusion

Full Access
Question # 26

An architect is designing a new greenfield environment with 600 ESXi hosts in an automated fashion. The engineering department already has a PXE Boot server, TFTP server, and DHCP server set up with an NFS mount for their current Linux servers.

The architect must be able to demonstrate and meet a security requirement to have all infrastructure processes separated.

Which recommendation should the architect make for the ESXi host deployment?

A.

Request an isolated network segment to use and dedicate it to Auto Deploy functions

B.

Ask the business to expand the engineering environment to service the virtual environment as well

C.

Request a common shared network with flexible security measures to accommodate different auto deployment options

D.

Deploy each ESXi host individually and document it to satisfy security requirements