During a Vblock System logical build, which three configuration changes require Unified Computing System Manager (UCSM) access? (Choose three.)
A SAN administrator must use the zone commit command to activate a zone set on a Cisco MDS 9148.
Which feature is enabled on the switch?
What are three components of the Cisco UCS system that make up the Vblock System 320 compute layer? (Choose three.)
How many EMC ESRS servers are deployed with a Vblock System 320 mini Advanced Management Pod (mini-AMP)?
What is the purpose of the EMC VNXe Connection Utility installed on the Vblock System 320 array management server?
What are two supported link configurations between the Cisco 2208 I/O Module and the Cisco UCS 6296UP fabric interconnects for a Vblock System 320? (Choose two.)
What are three supported drive types for Vblock System 320 arrays? (Choose three.)
Which two steps are required to complete a Cisco UCS Smart Call Home registration on a Vblock System? (Choose two.)
Which two statements are correct about Vblock System Release Certification Matrix (RCM) upgrades? (Choose two.)
Which component connects a Vblock System 720 to a customer's network aggregation layer?
In the Vblock System 720, what describes the VCE standard method of zoning?
What is the boot LUN size for an ESXi installation on a Vblock System 320?
During a Vblock System 320 deployment, the customer wants to disassociate four half-width blades in a single chassis for a future project.
Which tool is used to perform this compute reconfiguration?
An ESXi host connected to a Vblock System 720 storage array requires a new 2 TB LUN.
According to VCE best practice, which type of device must be created to add to the host?